The comprehensive facilities of the new Multipurpose Hospital of the Parc Sanitari Pere Virgili were made possible thanks to the application of industrialized solutions for the facilities and the use of a collaborative project planning tool within the Lean Construction methodology (Last Planner System and BIM Manager plan).

Summary of the main actions taken:

  • Medicinal gases
  • Plumbing
  • ACS (Sanitary Hot Water)
  • Hydraulic network air conditioning
  • BIE’s (Equipped Fire Extinguishers)
  • Air conditioning / ventilation ducts
  • Network buried sanitation
  • Electrical Installations
  • Operation of climate + ventilation units (UTA’s)
  • ISO-7 certification
  • BMS (Building Management System)
  • Low signals, telcos, V/D, accesses, patient-nurse
  • PFP (Passive Fire Protection)